Skip to content

Tarqy

Finding my way
  • Joined

  • Last visited

Everything posted by Tarqy

  1. Mine is also in the country! Being delivered a week on Monday.
  2. Looks like the rumours of them sorting the backlog appear to be true! I've just spoken with the dealer and its looking like good news! The car is now built (finally) and currently en-route from the factory to the EU port, should be with the dealer in around 5 weeks time!
  3. The dealer has advised that a provisional build date has been provided of week 24 - w/c 13/06/2022.
  4. I don't think it's necessarily leases, lots of them I'm seeing are linked to D. M. Keith ŠKODA Leeds and they are fleet orders so likely the lowest priority.
  5. I've just fired off my usual monthly whats happening email to the lease company. Last I heard I had a provisional build date of 27th of this month but I had one for May that slipped so I'll not hold my breath.
  6. Go figure, I ordered an identical car in Feb 2021. That means It's complete incompetence or intentional delays to avoid losses on orders placed before the price hikes. Either way it doesn't look good on Skoda.
  7. What colour did you go for? At this point I'm wondering if they've run out of black paint as its the only excuse they have left.
  8. Yeah its crazy, but if fuel prices keep going the way they are then this could well be my last ICE anyway 😂 my Octavia does around 50-55 mpg but I reckon I'm probably looking at 35-40 for the bear. Oh and they didn't mention a year in the update but I'm being optimistic and assuming they mean 22
  9. I just had an update! Apparently I have a provisional build date of w/c 27/06 along with the standard skinchies clauses incase it all goes tits. So that'll be over 17 months from the point of order to build if it actually goes ahead 🤞
  10. Identical spec and colour to mine ordered 6 months earlier and I still don't have a build week, as I've said previously there isn't any sort of conspiracy it just seems that Skoda are totally incompetent.
  11. It's a lease according to the post. Skoda at this point don't appear to have some sort of secret genius plan, They are "Simply Incompetent".
  12. I've still not had an update from the broker/dealer but i have seen over on facebook someone who ordered the exact same spec/colour 6 months after me has got confirmation the car is built and being shipped which really takes the ****.
  13. I've made that suggestion to the dealership and asked them to raise it with the factory to get confirmation that there isn't an issue with the order system. Will see what happens.
  14. This is the latest from the dealership. "Builds were taken off by SKODA last year and never replaced. Been sat with no build assigned since. Unfortunately all Kodiaq Sportline in our order bank are in the same position. Unknown ETA at the moment with very little information on when they will be built" I've asked them to escalate it so will see what happens. What's worrying is that they don't seem to be in the slightest bit alarmed that a bunch of orders got removed and have then had no movement for 6 months, like its just totally normal for orders to dissapear into a black hole while newer orders are being fulfilled. I suspect they are in on it and have no faith in a resolution but i can but try.
  15. This is true, prior to them having their tongues cut out Skoda chat confirmed that the order had been switched over to a facelift model.
  16. It's through leasing options and its legit, I have the SLI number for the order. I was able to track it with Skoda chat until they went silent last year. They even told me the order was placed via DM Keith Leeds so i know who the middleman is. I've also been able to extended my current VWFS lease by providing the SLI number as proof of an order for a new VW group vehicle. Most of the people who jumped on the same deal have received their vehicles as it was discussed quite a bit on the pistonheads leasing thread, I guess i just chose the wrong colour or something.
  17. Just here to steal @WarksKodiaq crown. Order placed 26/01/21 for the pre-facelift SKODA KODIAQ ESTATE 1.5 TSI Sport Line 5dr DSG [7 Seat] , No extras, Bl I've never had a confirmed build date at any point, I had a provisional one in Feb pre facelift then another in Aug post facelift but both times it was removed without explanation. I used to rant at Skoda chat but they won't even discuss orders anymore, they just direct you to the dealership who claim they can't do anything. It feels like I'm ****ing into the wind as there doesn't seem to be any sort of complaint or escalation process. The update is always the same - "Hope you are well. There is still no confirmed build date for your vehicle; once there is a confirmed build date the vehicle is usually 4 to 6 weeks from factory to the dealership" Lease on a 3/36 @ £894/£298. Too good a deal to cancel in the current climate so the wait goes on. Sadly Skoda have us all by the balls and they know it.

Important Information

Welcome to BRISKODA. Please note the following important links Terms of Use. We have a comprehensive Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Account

Navigation

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.