Skip to content

Delivery Dates For Octavia Vrs

Featured Replies

Some interesting dates. Here is mine for the list

Order Date ...............Colour...............Type...............Spec...............Engine...............Production

Begin Sept ...............Anthracite...........Hatch..............Manual............Diesel..................Week 50

Maxi dot computer, rain sensor and light assistant.

  • Replies 583
  • Views 56.3k
  • Created
  • Last Reply

Top Posters In This Topic

I feel for you, week 50 is a joke considering it was ordered in June and i thought i had it bad!

Skoda UK said the extended delay was due to the options on my car - 170 CR +dsg. Makes no sense as yours had leather +xenons too. JonnyIrl`s car arrived even quicker

Have front parking sensors + mf steering wheel + auto dim mirror +spare +mdi added another 6-14 weeks on?

Edited by teebee

Order Date ...............Colour...............Type...............Spec...............Engine...............Production

Middle Jun ...............Black.................Hatch.............Manual...........Diesel................Meant to be built last week, whatever number that was

Rear parking sensors, auto wipers/mirror

Edited by DbD

Order Date ...............Colour...............Type...............Spec...............Engine...............Production

Mid Jun (wk 24)...............Yellow...............Hatch..............DSG...............Petrol....................Begin Sept (wk 35). Loaded On Ship - Delivery approx. mid Nov.

its got pretty much everything, except leather, sunroof, mdi & rear wiper.

Edited by JR RS

Looks like i've been very lucky:

Order Date ...............Colour...............Type...............Spec...............Engine...............Production

Mid Sept....................White.................Hatch..............Manual...........Diesel...............Build Wk46

Options are maxidot, light assist, xenons, spare wheel, MDI plus getting Eibachs dealer fitted. Seems to be one of the shortest waits here so should have it for the first week in January as planned.

Here is mine

as of 27 Sept Confimred

Order Date ...............Colour...............Type...............Spec.......................Engine...............Production

20th July ................... Silver................. Hatch....F&R Park-Manual-Maxidot.... Diesel..................Week 44

Edited by lfc958

AGHHHHH....Just called the dealers.....my blue vRS manual 2.0TFSI has now been put back to week 49!

I've just had an update from the dealer, my car has gone back from build week 42 to 50!! Not a happy bunny!!

  • Author

Sorry to all you guys who have had there dates put back. Looking like the majority of us are not going to see our cars till 2011. Does anybody know how long it takes on the boat to bring them to the uk?

Skoda UK said the extended delay was due to the options on my car - 170 CR +dsg. Makes no sense as yours had leather +xenons too. JonnyIrl`s car arrived even quicker

Have front parking sensors + mf steering wheel + auto dim mirror +spare +mdi added another 6-14 weeks on?

Finally a bit of good news! now wk 47. If it stays like this, then due at dealers wk 51.

Wonder if it will be 2011 reg, or will Skoda UK insist car registered in 2010? I will probably be taking a loan car from wk 44, as I have a px. Seat did this to me with my current car,even though it was stuck at the docks in uk due to fog, until Jan 07.

Order Date ...............Colour..............Body Type......Transmisson......Fuel........................Production

14th August..........................Blue..................Hatch...................DSG............Diesel...................week 45 (from original 44)

Just spoken to the dealer to be told now week 45. Suggested I try again in a "couple of weeks" and see if "it has moved again, the right way this time"!

I am still hoping to get my car at the end of November (well here's hoping they can put it on the ship on 21st, then deliver and PDI in a week)

I want my new toy NOW :giggle:

Edited by mufcnumber18

Not 100% sure on exactly when mine was ordered but it was around the 15th July and its due to be dropped off to me on Friday.

Spec should be, I aint saying to much until its here in my hands and checked, White vRS estate oil burner with a manual box, MDI, xenons, auto lights etc, variable boot floor and maxidot.

Roll on Friday.

Sorry to all you guys who have had there dates put back. Looking like the majority of us are not going to see our cars till 2011. Does anybody know how long it takes on the boat to bring them to the uk?

I dont think it takes more than about a week. My dealer confirmed my car was at Emden on 4th and it arrived to the UK today (12th), so 7-8 days max on the boat, it looks like...

Edited by amii21

I dont think it takes more than about a week. My dealer confirmed my car was at Emden on 4th and it arrived to the UK today (12th), so 7-8 days max on the boat, it looks like...

A week to cross the North Sea? Must be using Viking Longships. :yes: Row faster!

My original post:-

Here is mine

as of 27 Sept Confimred

Order Date ...............Colour...............Type...............Spec.......................Engine...............Production

20th July ................... Silver................. Hatch....F&R Park-Manual-Maxidot.... Diesel..................Week 44

Update

As of 12 Oct Confirmed

Order Date ...............Colour...............Type...............Spec.......................Engine...............Production

20th July ................... Silver................. Hatch....F&R Park-Manual-Maxidot.... Diesel..................Week 45

My 500 is PX for the Octy, here are a couple of Dilemas -

I am putting miles on the 500 along with risk of damage whilst the order gets delayed.

I have a plate I want transferring across which if the dealer does when the car arrives it will cost £80, to put on retainer is £110.

Just told dealer that at the end of Nov, & that delay could add 600 miles to the 500 as with wk44 build i would have got it just in time .

Whilst I can do without the car now, I am concerned about the miles being added, specially the 600 @ end of Nov. The dealer has offered a loan car for the Nov trip so I dont add the 600 miles.

Do it just bite the bullet & pay the £110 retainer & let the car go, wit a risk of not having a car for end of Nov

OR

Do i negotiate a loan car for family trip putt plate on retainer, & let dealer have my PX car ?

When it came to my part-ex. the dealer said that it was their problem that they couldn't source us a car earlier and to use our car exactly how we wished until then. So effectively it was a free rental car, as the payments were coming directly off the cost of the new one, as the value was already agreed.

This is unbelievable

VRS Diesel

Order Date ...............Colour................................Body Type......Transmisson......Fuel........................Production

28th July....................Black magic pearl............Hatch................manual............Diesel...................week 1 of 2011 !!!! (from original 41)

with front and rear parking sensors, maxidot and mdi

i think what some of you have said about diesels taking longer maybe true

The thing that really annoys me is that i've agreed part exchange at a certain mileage and i average over 1800 miles a month. so every week delay is going to cost me a considerable amount in lost px price and every extra week driving a 1.2 petrol up and down german autobahns is going to cost me considerably more in fuel.

AAAGGH!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

Edited by spheinau

Hi Guys,

Well better add my VRS CR170 to the ever growing list of build week push backs !!! Ordered July and now looking at build week 48 !!!!! Ive gone for all extras except Sat Nav on full leather. Better be worth the wait !!!!! :wonder: :wonder: :wonder:

race blue diesel vrs manual hatch spare wheel auto mirrors/lights rear sunblind build week 1 ordered end sep

Edited by bottlingmad

  • Author

Madmancunian can you tell us please what colour transmisison fuel please so can add you to table cheers

Here's mine:-

Ordered End Sept Black Hatch Manual Petrol Week 50

Maxidot, VRS Leather, Heated seats

You are a brave man doing this & I take my hat off to you, specially with all the changes

Here is my latest

20th July ................... Silver................. Hatch....F&R Park-Manual-Maxidot.... Diesel..................Week 44 ( was 35, 42,43)

Hi Guys

Just had a call and my VRS is in the UK woohoo!!. Any one know how long it usually takes to arrive at the dealer? They are in Durham.

Early June............Black................Hatch.................Manual.................Diesel...................Arrived in the UK

Only extra is auto lights and auto dimming RVM.

Cheers

Edited by gwyn

Madmancunian can you tell us please what colour transmisison fuel please so can add you to table cheers

Colour - candy white, Manual, Diesel........ is there a pattern emerging ?lol

Here is my latest

29th Sept ................... Race Blue................. Hatch....Rear Park-Manual-Maxidot-Auto Dim-VRS Leather-Heated Seats.... Petrol..................Week 50 ( that's the build week)

Create an account or sign in to comment

Recently Browsing 0

  • No registered users viewing this page.

Important Information

Welcome to BRISKODA. Please note the following important links Terms of Use. We have a comprehensive Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Account

Navigation

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.